Skip to main content
Demo tenant — read-only. This is a live product walkthrough with a scripted deal. No login required.
Exit to homepage
Step 5 · IC Memo

1-page memo, every figure traceable

This memo composes signal score + risk + ESG + team narrative into a single decision record. 20 citations back it.

Executive summary

NorthLight Solar-Storage Series B is a mid-stage climate-infrastructure opportunity in a low-risk jurisdiction with a signal score of 78/100. Diligence is audit-grade: every figure below traces to a document and a lineage record.

Thesis

80 MW solar-plus-storage Series B with a contracted 15-year PPA, investment-grade offtaker, and a team that has closed two comparable deals within 36 months. Permitting is the critical path — base case is unblocked closure within the quarter.

Risks

  • Permitting exposure — regional authority review pending (medium).
  • PPA counterparty concentration (low — step-in rights mitigate).
  • Battery OEM track record short (low — warranty wrap mitigates).

Recommendation

proceed

That was the scripted walkthrough.

Every number you saw was backed by a citation and a lineage trace. Your own tenant works exactly the same way — with your own data.